Difference: MAST_Diagnostic (48 vs. 49)

Revision 492013-08-04 - lc_2eramona

Line: 1 to 1
 
META TOPICPARENT name="Research"
-- RamonaValenzuelaPerez - 2012-06-21
Line: 12 to 12
 The Proton Detector’s (PD) data will yield pulse height spectra created by Protons and Tritons emitted from the plasma during Neutral Beam Injection. Validation of the subsequent PD fast ion emission plasma profile will involve MAST Neutron Camera data. Preliminary testing of PD electronics and data acquisition software occurred during neutral beam, toroidal field coil, poloidal field coil, and ELM coil testing in March 2013. Probe head manufacturing and software development will continue to prepare for a July 2013 installation in MAST. [Excerpt contributed to the Annual Report of the EURATOM/CCFE Fusion Programme 2012/13]

Picture_2.png

Changed:
<
<

Summer Data Collection

  • Diagnostic installation: July 29th - August 2nd 2013
  • Data collection: August 5th - August 23rd 2013
  • Parasitic data collection: September 3rd - September 12th 2013
  • PPPL onsite collaborators: Doug Darrow
  • FIU onsite collaborators: Werner Boeglin, Ramona Perez, Adrianna Angulo, Pierre Avila, Omar Leon, Carlos Lopez
Dates are based upon RP/DSF Schedule Last Updated on 25/4/2013
>
>

Summer Data Collection Dates

  • Diagnostic installation: July 22nd - August 12th 2013
  • Parasitic Data collection: August 13th - August 16th & September
  • Dedicated Data collection: August 19th - August 23rd
  • Onsite collaborators (at CCFE)
    • July 22nd - September 13th: Ramona Perez (FIU)
    • August 5th - August 16th: Werner Boeglin (FIU), Adrianna Angulo (FIU), Carlos Lopez (FIU), Omar Leon (FIU), Pierre Avila (FIU)
    • August 12th- August 23rd: Doug Darrow (PPPL)
  • FP-001 & FP-005 Planning Meeting: August 5th

PD Installation Updates

PD_Status_Report.pdf

PD_INSTALLATION_080413.pdf

 

Electrical Design Review

Date

Line: 212 to 219
 
META FILEATTACHMENT attachment="PD_22_Design_062013.pdf" attr="h" comment="" date="1371761451" name="PD_22_Design_062013.pdf" path="PD_22_Design_062013.pdf" size="6088225" user="lc_2eramona" version="1"
META FILEATTACHMENT attachment="PD_22_Design_062013_PMT.pdf" attr="h" comment="" date="1372872478" name="PD_22_Design_062013_PMT.pdf" path="PD_22_Design_062013_PMT.pdf" size="6088225" user="lc_2eramona" version="1"
META FILEATTACHMENT attachment="PD_22_Design_070213.pdf" attr="h" comment="" date="1372872492" name="PD_22_Design_070213.pdf" path="PD_22_Design_070213.pdf" size="6366980" user="lc_2eramona" version="1"
Added:
>
>
META FILEATTACHMENT attachment="PD_INSTALLATION_080413.pdf" attr="h" comment="" date="1375652580" name="PD_INSTALLATION_080413.pdf" path="PD_INSTALLATION_080413.pdf" size="74874" user="lc_2eramona" version="1"
META FILEATTACHMENT attachment="PD_Status_Report.pdf" attr="h" comment="" date="1375652598" name="PD_Status_Report.pdf" path="PD_Status_Report.pdf" size="53624" user="lc_2eramona" version="1"
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 1999-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback
Note: Please contribute updates to this topic on TWiki.org at TWiki:TWiki.MAST_Diagnostic.