Proton Detector |
|
< < | Noise Testing, 2013 |
> > | Summer Data Collection
- Diagnostic installation: July 1st - July 15th 2013
- Data collection: July 16th - July 26th 2013
- Parasitic data collection: July 27th - End of M9 Camp 2013
Preliminary Noise Testing
March 19th, 2013 Group Discussion
Noise Testing Information, March 2013 |
|
Collaborators travelling to MAST: |
|
< < |
- Ramona Perez: March 4th - March 15th 2013
|
> > |
- Ramona Perez: March 11th - March 24th 2013
|
|
- Werner Boeglin: March 11th - March 15th 2013
|
|
< < |
- Doug Darrow: March 11th - March 15th 2013
|
> > |
- Doug Darrow: March 11th - March 20th 2013
|
| Radiation Source Use - Method Statments: |
| |
|
< < | Machine Drawings - Mechanical Design 2013 |
> > | Drawings - Mechanical Design 2013 |
|
- This reflects new length of 185mm and new diameter of 96mm
- Coming soon (changes to probe head orientation angles as during Noise Testing)
|
|
< < | Prototype, January 2013 |
> > | Prototype
Installation: January 2013 |
| |
|
< < | Machine Drawings: |
> > | Comments:
- Prototype type dimensions fit into RP access cube (reduction in probe head diameter requested for greater ease of installation)
- Our prototype RP connector may have become distorted during the welding of the connector to the prototype shell (this issue was fixed at CCFE)
- A dummy RP shaft end was created and sent to FIU to test the fit of the RP connector before bringing the diagnostic for the summer data collection
- Vacuum vent hole had to be drilled in top of prototype to bake for RP installation (at CCFE)
Machine Drawings: |
| |
|
> > | Mechanical Design Review |
| MAST Mechanical Design Review Materials, September 9th 2012
Presentation: |
|
|
|
< < |
|
|
META FILEATTACHMENT |
attachment="MAST_Design_Presentation_061912.pdf" attr="h" comment="" date="1340298613" name="MAST_Design_Presentation_061912.pdf" path="MAST_Design_Presentation_061912.pdf" size="1012453" user="lc_2eramona" version="1" |
META FILEATTACHMENT |
attachment="notes_MAST_Design_Presentation_061912.pdf" attr="h" comment="" date="1340298613" name="notes_MAST_Design_Presentation_061912.pdf" path="notes_MAST_Design_Presentation_061912.pdf" size="1264028" user="lc_2eramona" version="1" |
|
|
META FILEATTACHMENT |
attachment="ff357_detector_calibration_NOdata_RP.rtf" attr="h" comment="" date="1360535150" name="ff357_detector_calibration_NOdata_RP.rtf" path="ff357_detector_calibration_NOdata_RP.rtf" size="38779" user="lc_2eramona" version="1" |
META FILEATTACHMENT |
attachment="electronics_schema_noise_visual_updated.pdf" attr="h" comment="" date="1360536198" name="electronics_schema_noise_visual_updated.pdf" path="electronics_schema_noise_visual_updated.pdf" size="151188" user="lc_2eramona" version="1" |
META FILEATTACHMENT |
attachment="cable_info.pdf" attr="h" comment="" date="1361906294" name="cable_info.pdf" path="cable_info.pdf" size="120116" user="lc_2eramona" version="1" |
|
|
> > |
META FILEATTACHMENT |
attachment="group_discussion_031913_comments.pdf" attr="h" comment="" date="1363735879" name="group_discussion_031913_comments.pdf" path="group_discussion_031913_comments.pdf" size="1328710" user="lc_2eramona" version="1" |
|