-- RamonaValenzuelaPerez - 2012-06-21

MAST Diagnostic: Proton Detector

Noise Testing, 2013

Collaborators travelling to MAST:

  • Ramona Perez: March 4th - March 15th 2013
  • Werner Boeglin: March 11th - March 15th 2013
  • Doug Darrow: March 11th - March 15th 2013
Electronics Schema (current draft):

Prototype, January 2013

Machine Drawings:

Machine Drawings - Mechanical Design 2013

MAST Mechanical Design Review Materials, September 9th 2012

Presentation:

Machine Drawings: Supporting Documents (for reference if needed):

Mechanical Design Overview after June 26 2012 MAST Colleagues Discussion

Mechanical Design Overview after June 19 2012 Meeting with PPPL Colleagues

Edit | Attach | Watch | Print version | History: r92 | r15 < r14 < r13 < r12 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r13 - 2013-01-26 - lc_2eramona
 
  • Edit
  • Attach
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 1999-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback
Note: Please contribute updates to this topic on TWiki.org at TWiki:TWiki.MAST_Diagnostic.