META TOPICPARENT |
name="Research" |
-- RamonaValenzuelaPerez - 2012-06-21 |
|
- FP-001 & FP-005 Planning Meeting: August 5th, August 15th
- Diagnostic installation: July 22nd - August 12th 2013
- Proton Detector Completely Installed and Operational: August 15th
|
|
< < | PD_INSTALLATION_DETAILS_081613.pdf |
> > | PD_INSTALLATION_DETAILS_081613_Ramona.pdf |
| Electrical Design Review
Final Cable Block Diagram |
|
> > |
- Draft for Final Cable Block Diagram Drawn by: Ramona Perez
- Final Cable Block Diagram (below) Drawn by: Andrew Page (CCFE)
|
|
MAST Electrical Design Review Materials |
|
- Werner Boeglin: March 11th - March 15th 2013
- Doug Darrow: March 11th - March 20th 2013
Instructions to run DAQ Program (if need be) |
|
< < | |
> > | |
|
- To restart computer press Alt+fn+F4 to bring up shutdown options (select restart)
Information for sending equipment back to FIU after remote testing |
|
< < | |
> > | |
| Radiation source |
| Mechanical Design
- Changes to probe head orientation angles made during noise testing
March 19th, 2013 Noise Testing Group Meeting |
|
< < | |
> > | |
| Prototype
Installation: January 2013 |
| Date
Materials |
|
> > |
- Presentation Part 1 Author: Werner Boeglin (please email him for presentation)
- Presentation Part 2 Author: Ramona Perez
|
| |
| Date
Materials |
|
> > |
- Presentation Author: Ramona Perez
|
|
Preliminary Mechanical Design - PPPL |
| Date
Materials |
|
> > |
- Presentation Author: Ramona Perez
|
| |